Images
Cavotec film crew shootin...
Mårten Ivert and Oskar Willers shoot Alternative Maritime Power (AMP) pit systems at the Port of Los Angeles on the latest leg of Cavotec...
License | © All rights reserved |
---|---|
Photographer / Source | Cavotec |
Size421 KB • 2048 x 1536 px |
A Cavotec AMP unit is car...
A Cavotec AMP unit is carefully winched into place on APL Singapore Port of Oakland, May 26, 2011.
License | © All rights reserved |
---|---|
Photographer / Source | Cavotec |
Size145 KB • 1184 x 888 px |
Box magic - Filming Cavot...
Box magic - Filming Cavotec on the 4,800 TEU-container ship APL Singapore at the Port of Oakland, May 26, 2011.
License | © All rights reserved |
---|---|
Photographer / Source | Cavotec |
Size92.8 KB • 600 x 450 px |
Mårten strikes a pose at ...
The latest leg of the Cavotec film tour takes us to San Francisco's Port of Oakland to shoot our shore-to-ship power systems on board the...
License | © All rights reserved |
---|---|
Photographer / Source | Cavotec |
Size107 KB • 600 x 450 px |
Cavotec automated mooring...
Cavotec MoorMaster™ automated mooring units detach a vessel at Port Hedland - all at the touch of a button and in a matter of seconds. #C...
License | © All rights reserved |
---|---|
Photographer / Source | Cavotec |
Size79.1 KB • 600 x 450 px |
All set to film the detac...
Oscar, our cameraman, prepares to film the 14 MoorMaster™ automated mooring units detach from a vessel at Port Hedland's Utah Point iron ...
License | © All rights reserved |
---|---|
Photographer / Source | Cavotec |
Size78.6 KB • 600 x 450 px |
Final film shoot in Port ...
The Cavotec film crew wrap up filming for the day at Port Hedland, Western Australia on the most recent leg of a trip to gather material ...
License | © All rights reserved |
---|---|
Photographer / Source | Cavotec |
Size78.1 KB • 600 x 450 px |
The intrepid (and dusty) ...
The intrepid Cavotec film crew take a break after a long day's filming MoorMaster™ automated mooring units at Port Hedland, Western Austr...
License | © All rights reserved |
---|---|
Photographer / Source | Cavotec |
Size75.8 KB • 640 x 480 px |
MoorMaster automated moor...
MoorMaster™ MM200B units at Utah Point berth Port Hedland May 23, 2011.
License | © All rights reserved |
---|---|
Photographer / Source | Cavotec |
Size50.6 KB • 640 x 480 px |
All secure: MoorMaster™ M...
MoorMaster™ MM200B units perform another safe mooring operation in a matter of seconds, Utah Point berth, Port Hedland May 23, 2011.
License | © All rights reserved |
---|---|
Photographer / Source | Cavotec |
Size59.2 KB • 640 x 480 px |